Boulevard Park by Wasl is a new residential development in the large Wasl Gate area of Jebel Ali. It is being built by Wasl near Sheikh Zayed Road and Energy Metro Station. The buildings in the development are connected by a shared podium with green courtyards, walkways and views of the park and boulevard with shops and cafés.
The project offers a variety of property types so that everyone can find the right format for them. There are studios ranging from 523 sqft (49 m²), one-bedroom apartments from 832 sqft (77 m²), two-bedroom apartments from 1238 sqft (115 m²) and three-bedroom apartments from 1705 sqft (158 m²). For those who need more space, there are two-bedroom duplexes starting at 1670 sqft (155 m²) and three-bedroom duplexes starting at 3280 sqft (305 m²).
For those who prefer spacious living, Boulevard Park by Wasl offers three-bedroom penthouses starting at 2868 sqft (266 m²) and four-bedroom townhouses starting at 4065 sqft (378 m²). A separate lift is planned for the penthouses and townhouses at Boulevard Park by Wasl.
The design of property at Boulevard Park by Wasl is modern. The facades are free of unnecessary decoration, with clean lines, neutral shades and large windows. Balconies make the apartments at Boulevard Park by Wasl more comfortable and add light.
Inside this property in Dubai, there are bright interiors, well-thought-out layouts, and enough space for storage, work areas, and relaxation. The kitchens will be semi-open or completely separate, with a convenient linear or corner layout and high-quality finishing materials.
Residents of these apartments at Wasl Gate will have access to swimming pools for adults and children, a modern fitness centre, spa, lounges for relaxation and work, children's playgrounds and indoor playrooms.
The project includes landscaped gardens, walking paths, lounges, and barbecue areas. Security will be provided by 24/7 security and controlled access to the buildings. Underground parking and guest parking spaces are provided for cars.
Buyers of apartments at Boulevard Park by Wasl can take advantage of an interest-free 60/40 payment plan with a 10% down payment. Construction of this property at Wasl Gate is scheduled for completion in Q4 2029.






















